Glenn Wakai
- Democratic
- Senator
- District 15
Provides for timely review by the public utilities commission in its decision-making process regarding proposed renewable energy projects. Requires timely completion of the interconnection process by electric public utilities. Allows electric public utilities and developers to agree to extend the timely completion of the interconnection process. (SD1)
Report adopted; Passed Second Reading, as amended (SD 1) and referred to CPN/WAM.
Reported from EET (Stand. Com. Rep. No. 349) with recommendation of passage on Second Reading, as amended (SD 1) and referral to CPN/WAM.
The committee(s) on EET recommend(s) that the measure be PASSED, WITH AMENDMENTS. The votes in EET were as follows: 5 Aye(s): Senator(s) Wakai, Misalucha, Lee, Fevella; Aye(s) with reservations: Senator(s) Riviere ; 0 No(es): none; and 0 Excused: none.
The committee(s) on EET has scheduled a public hearing on 02-05-21 3:00PM in conference room 224.
Re-Referred to EET, CPN/WAM.
Referred to EET, CPN.
Passed First Reading.
Introduced.
Bill Text Versions | Format |
---|---|
SB929_SD1 | PDF HTML |
SB929 | PDF HTML |
Document | Format |
---|---|
Committee Report SB929_SD1_SSCR349_ | PDF HTML |
Testimony SB929_TESTIMONY_EET_02-05-21_ |